top of page

CENTRAL HIGHLAND TIMBER BRIDGE REPLACEMENT

Central Highlands. 29 June 2017. Bridge Repair Project.

Timber bridges that required major repairs were replace with precast modular bridges, improving access and reducing Councils long term maintenance requirements.


Comments


BARCALDINE (HEAD OFFICE) 

73 Elm Street (PO Box 169)

Barcaldine  QLD  4725

Phone:  07 4651 5177

Email:  admin@gbaengineers.com.au

EMERALD

Unit 4, 5 Church Lane (PO Box 305)

Emerald  QLD  4720

Phone: 07 4982 1826

ROCKHAMPTON

Unit 2, 74 Victoria Parade (PO Box 282)

Rockhampton  QLD  4700

Phone:  07 4843 5519

TOOWOOMBA

Suite 2, 5 Mill Street

Toowoomba QLD 4350

Phone: 07 4651 5177

  • Youtube

Copyright © 2021 GBA Consulting Engineers

bottom of page